ru
|
en
Important Projects
Lebedinsky GOK
TPP “Barh” (India)
Toachi Pilaton (Ecuador)
Polar Cranes
Oleniy Ruchey Deposit
Radio-telescope RTF-32
Cherepets SDPP
Ust-Khantayskaya HPP
Navoi Mining and Metallurgical Combinat (Uzbekistan)
Space Complexes
Products
About Company
Production
Contact Information
News
Policy of Integrated Management System
History
News
Subscribe
December 30, 2020
JSC TYAZHMASH was awarded in the city campaign “Bravo! Bravissimo!”
December 17, 2020
Important stage of equipment installation began at Verkhne-Tulomskaya HPP hydrounit No. 1.
December 11, 2020
JSC TYAZHMASH was recognized as the best social partner of the Samara Region Ministry of Labor in 2020
December 2, 2020
The equipment produced by JSC TYAZHMASH was put into guaranteed operation at the third power unit of Primorskaya TPP
November 30, 2020
JSC TYAZHMASH created their own ACS for NPP polar crane
November 27, 2020
The hydropower unit of station No. 2 manufactured by Tyazhmash JSC successfully passed comprehensive tests at the Irkutsk Hydro Power Plant
November 26, 2020
First-aid station of JSC TYAZHMASH has organised distribution of medicines for its employees
November 10, 2020
Beloporozhskaya SHPP-1 with equipment manufactured by Tyazhmash JSC is put into commercial operation
October 2, 2020
A disk pelletizer was shipped to Lebedinsky GOK
October 1, 2020
The Director General of JSC TYAZHMASH was awarded the award pin "For contribution to the development of nuclear industry" of the 2nd degree.
September 4, 2020
TYAZHMASH signed a contract with Polymetal company
September 3, 2020
A new laser tracker was put into operation at TYAZHMASH plant
August 28, 2020
Deputy Chairman of Samara Region Government got acquainted with the work of JSC “TYAZHMASH”
August 4, 2020
New contract signed for supply of equipment for Akkuyu NPP in Turkey
July 28, 2020
Generator rotor was lowered into the unit pit at Alluriquin HPP in Ecuador
July 15, 2020
Two new machines are being installed in the workshops of “Tyazhmash” JSC
July 8, 2020
First crane for Arctic LNG-2 project awaiting shipment
June 8, 2020
Works on the second hydroturbine for Irkutskaya HPP are at completion stage
May 25, 2020
Observance of preventive measures to avoid coronavirus spreading continues at JSC TYAZHMASH
May 13, 2020
TYAZHMASH signed a contract with Nornickel to supply equipment for Talnakh processing plant
May 7, 2020
TYAZHMASH started shipping equipment for Lebedinsky GOK
April 28, 2020
A new method of gear cutting on the mill crown was successfully tested
April 14, 2020
JSC TYAZHMASH signed a contract with JSC North Kuzbass Energy Company
March 19, 2020
Representatives of Rosatom production system inspected the work of TYAZHMASH JSC
March 18, 2020
The second construction stage of Akkuyu NPP is in progress in Turkey
March 3, 2020
An important stage in the fulfillment of the order for the Irkutskaya HPP has been completed
February 4, 2020
Equipment for CJSC Agarak Copper and Molybdenum Combine in Armenia is fully shipped
January 31, 2020
The project for PJSC Shipyard Severnaya Verf is completed
December 27, 2019
The Toachi Pilaton project in Ecuador has reached an important milestone
December 25, 2019
TYAZHMASH completed reconstruction of Belorechenskaya HPP
November 29, 2019
TYAZHMASH is completing the installation of the NS17F2 machine after the upgrade
November 27, 2019
Production of the first crane for the Arctic LNG-2 project is almost completed
October 29, 2019
JSC TYAZHMASH will supply ore feeding equipment to Talnakh processing plant
October 2, 2019
Works for two mining companies are being completed in the workshops of JSC TYAZHMASH
September 16, 2019
Hydraulic unit No. 5 was put into operation at Ust-Khantayskaya HPP
September 10, 2019
ČKD Blansko Holding supplied the final batch of equipment to Beloporozhskie SHPPs
September 5, 2019
TYAZHMASH signed the contract on equipment supply to Davao HPP
August 30, 2019
Customers from Mongolia visited TYAZHMASH
August 28, 2019
TYAZHMASH will equip two nuclear power plants in China
August 2, 2019
TYAZHMASH concluded contract on equipment supply for Navoi Mining and Metallurgical Combinat (Uzbekistan)
July 31, 2019
Core catcher manufactured by JSC TYAZHMASH arrived at Akkuyu NPP in Turkey
July 15, 2019
Contract on implementation of “Toachi Pilaton” project is signed
July 11, 2019
Representatives of JSC Institute Hydroproject visited TYAZHMASH
July 10, 2019
Vice President of engineering division of ROSATOM visited TYAZHMASH
June 27, 2019
The first core catcher was shipped to NPP Akkuyu
June 6, 2019
Dry protection is shipped to Kurskaya NPP-2
May 31, 2019
JSC TYAZHMASH concluded contracts on equipment production for two foreign NPPs
May 27, 2019
Participants of Hanhikivi-1 NPP construction visited TYAZHMASH
May 24, 2019
TYAZHMASH will participate in upgrading of Verkhne-Tulomskaya HPP
May 23, 2019
TYAZHMASH will produce equipment for Mikhailovsky mining-and-processing integrated works
May 13, 2019
TYAZHMASH will supply equipment to Verkhne-Menkeche deposit
April 26, 2019
TYAZHMASH finished the important stage of hydraulic turbine production for Irkutsk HPP
April 16, 2019
Runner for Beloporozhskie SHPPs was accepted
April 8, 2019
Core catcher produced by TYAZHMASH is mounted at NPP Rooppur
April 4, 2019
TYAZHMASH will supply equipment to HPP in Indonesia
March 29, 2019
TYAZHMASH shipped oversized units of the first crane to Beloporozhskie SHPPs
March 26, 2019
TYAZHMASH will manufacture two separators for Khakassia
March 6, 2019
TYAZHMASH concluded contract with Shanghai Electric Group
March 5, 2019
JSC TYAZMASH will supply equipment to HPP Z’Mutt
February 26, 2019
TYAZHMASH concluded contract on equipment production for Mnogovershinnoe deposit
February 15, 2019
TYAZHMASH is ready to manufacture equipment for NPP Akkuyu
February 12, 2019
TYAZHMASH proceeds to check assembly of umbilical tower for spaceport Vostochny
February 11, 2019
TYAZHMASH will supply equipment for PAO NOVATEK
January 31, 2019
Representatives of PAO Severstal visited JSC TYAZHMASH
January 25, 2019
ROSATOM included TYAZHMASH into the Register of best technologies
January 21, 2019
Delegation from China visited TYAZHMASH
December 29, 2018
Hydraulic unit No. 1 of Belorechenskaya HPP was put into operation
December 11, 2018
JSC TYAZHMASH obtained special prize in “Kommersant-2018”
December 6, 2018
Leaders of JSC TYAZHMASH participated in meeting of Commission on Development of Machine-Building Complex
November 23, 2018
JSC TYAZHMASH began mechanical processing of metal structures for spaceport Vostochny
November 22, 2018
The next large batch of equipment was shipped to NPP Rooppur
November 21, 2018
The third runner for Вeloporozhskie HPPs was tested by CKD Blansko Holding
November 13, 2018
Catcher is being mounted at NPP Rooppur
November 9, 2018
Wicket gate for Verkhne-Tulomskaya HPP successfully passed tests
October 30, 2018
Girder of the first crane for Severnaya Verf is assembled
October 29, 2018
JSC TYAZHMASH and JSC PA Sevmash concluded the contract
October 19, 2018
JSC TYAZHMASH: results of three quarters of 2018
October 8, 2018
TYAZHMASH will produce polar cranes for NPP Rooppur
September 26, 2018
TYAZHMASH obtained new order from GeoProMining
September 13, 2018
Representatives of Bangladesh visited TYAZHMASH
September 4, 2018
Hydraulic unit No. 4 was put into operation at Ust-Khantayskaya HPP
August 20, 2018
Runner for Verkhne-Tulomskaya HPP passed functional tests
August 14, 2018
ČKD Blansko SMALL HYDRO signed contracts on equipment supply
August 13, 2018
Startup complex No. 4 for Ust-Khantayskaya HPP successfully passed acceptance tests
August 10, 2018
Leaders of JSC Atomstroyexport visited TYAZHMASH
August 6, 2018
Transport lock for Leningradskaya NPP-2 left TYAZHMASH
July 31, 2018
Equipment production for Beloporozhskie SHPPs completed
July 19, 2018
Head of NPCIL representative office in Russia visited TYAZHMASH
July 9, 2018
TYAZHMASH leaders awarded labor dynasties
July 5, 2018
JSC TYAZHMASH: half-year results
June 27, 2018
TYAZHMASH is focused on production for Kudankulam NPP
June 4, 2018
TYAZHMASH signed the contract on equipment supply to Bulgaria
May 30, 2018
Young people of Samara region visited TYAZHMASH
May 28, 2018
JSC TYAZHMASH was visited by delegation
May 21, 2018
Leaders of educational institutions visited TYAZHMASH
May 11, 2018
Equipment for NPP Rooppur was shipped to Bangladesh
April 20, 2018
TYAZHMASH participated in MiningWorld Russia
April 16, 2018
JSC TYAZHMASH signed the contract on Irkutsk HPP technical upgrading
April 10, 2018
JSC TYAZHMASH: results of the first quarter of 2018
April 4, 2018
Winners of “IT-Project-2017” were decided
2020
2019
2018
2017
2016
2015
2014