News

Batch of equipment for Beloporozhskaya SHPP-2 was accepted by the Customer

October 11, 2017

In accordance with production and quality control plan, the regular batch of hydroturbine equipment for Beloporozhskaya SHPP-2 was accepted at the production site of the workshop No. 30.

With participation of representatives from Nord Gidro Bely Porog, LLC, control assembly and functional tests of the wicket gate and control assembly of the hydraulic turbine guide bearing were accepted. Now the equipment is ready for further operations.