News

JSC TYAZHMASH: results of 2016

January 30, 2017

In 2016 the annual output of the plant was 11.5 bln roubles and exceeded indexes of the previous years. The sum of concluded contracts reached 14.2 bln roubles.

In 2016 JSC TYAZHMASH manufactured various heat-power equipment for power facilities in Kazakhstan, TPP in Sovetskaya Gavan’ and Nizhnekamskaya TPP. The new projects include agreements on supply of equipment for Primorskaya TPP and TPP Kostolac B in Serbia.

In 2016 TYAZHMASH implemented projects in the sphere of conveyor and crushing-and-grinding equipment, the largest ones were for Almalyk Mining-Metallurgical Complex (Uzbekistan) and EuroChem Usolsky Potash.

In the sphere of production for nuclear power industry TYAZHMASH received contracts on equipment manufacturing for NPP Bushehr (Iran), NPP Rooppur (Bangladesh), NPP Kudankulam (India).

TYAZHMASH concluded contract on supply of equipment for Verkhne-Tulomskaya HPP.

JSC TYAZHMASH has ambitious plans for 2017. The annual output will reach 13.2 bln roubles, and the sum of concluded contracts will be about 18.5 bln roubles.

A. F. Trifonov, Director General of JSC TYAZHMASH said that year 2017 would be very busy for the plant. In his opinion, the main purpose of manufacturing was to provide proper quality of products and to improve it.